st helena airport project failure sorted by
relevance

Admin21.06.2021

St Helena Airport Project > ALMAR

Normal hours and working arrangements will continue.
6801
Admin31.07.2021

St Helena Airport Project > ALMAR

PDF from the original on 4 January 2014.
Admin28.07.2021

St Helena airport costing £285m of UK money is delayed over safety concerns

One could say that the above classic mistakes 3, 4, 8 and 9 were made.
4906
Admin12.07.2021

Saint Helena Airport

The contract to Design, Build and Operate St Helena Airport was awarded to Basil Read a South African construction company in 2011 and signed on 3rd November 2011.
1404
Admin28.07.2021

Saint Helena's historic isolation continues as airport opening delayed

Facilities Inside the passenger terminal There are two main buildings, the terminal building, and the combined building for airport operations, e.
54010
Admin23.08.2021

DfID on blame for St Helena airport say MPs

The flight used the southbound direction, the one with wind shear problems, but the wind was fairly calm.
59010
Admin13.07.2021

A dot in the Atlantic: the Saint Helena airport project

A second bid was issued around 2007, where there was initial interest from several parties, but in the end only two bids were received, one from Basil Read and one from a European contractor.
1207
Admin29.06.2021

St Helena Airport Project > ALMAR

The PAC says the impact of wind conditions on the island should have been anticipated by the department, pointing out that Charles Darwin wrote about the island's high winds as early as 1836.
3901
Admin10.06.2021

UPDATE ON ST HELENA AIRPORT PROJECT CONSTRUCTION WORKS

In December 2016, the Saint Helena government issued a tender for an airline to establish a scheduled commercial service, using the less turbulent northbound landing direction only.
86010
Admin04.09.2021

DfID on blame for St Helena airport say MPs

DfID is, the committee adds, yet to determine the "extent or cost of the remedial action required to bring the airport into commercial use", with the department attacked for being "unwilling to tell us who was responsible" for oversight of the project until its own internal review is complete.
2007